Message Board

Topic: recent oil/chip on white oak rd Post A Reply | Post A New Message
Message Posted: 2/11/2019
By: Jennifer Gunnet. Twp. Mgr.

Jeff - We are aware of the problem and have been in contact with the contractor who did the work last summer. It will be a couple of months before the weather allows for a fix to occur.
Message Posted: 2/7/2019
By: Jeff

Im sure by now this part of white oak is becoming a royal thorn in your side. Im hoping you are aware of the current condition of the recent oil/chip surface after the last 2 snow storms with the plows ripping it off making it to be a not so nice ride. please let us residents of white oak rd know of any fixes in the future.